ACRONIS Backup & Recovery 10 Advanced Workstation Betriebsanweisung Seite 169

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 369
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 168
Copyright © Acronis, Inc., 2000-2010 169
Use the Information panel to review detailed information on the selected plan (task). The panel
is collapsed by default. To expand the panel, click the
chevron. The content of the panel is
also duplicated in the Plan details (p. 178) and Task details (p. 176) windows respectively.
Understanding states and statuses
Backup plan execution states
A backup plan can be in one of the following execution states: Idle; Waiting; Running; Stopping;
Need Interaction.
Plan states names are the same as task state names because a plan state is a cumulative state of the
plan's tasks.
State How it is determined How to handle
1 Need interaction At l eas t one ta s k needs
user interaction.
Otherwi se, s ee 2.
Identify the tasks that need interaction (the program will
display what action is needed) -> Stop th e tas ks or enable
the tasks to run (change media; provide additional space on
the vaul t; ignore the r ea d error; create th e mi ssi ng Acronis
Secure Zon e).
2 Running At least one tas k is
running.
Otherwi se, s ee 3.
No action is required.
3 Waiting At l east one task is
waiting.
Otherwi se, s ee 4.
Waiting for condition. This situation is quite normal, but
delaying a backup for too long is risky. The solution may be
to s et th e maxi mum del ay or force the condi tion (tell the
user to log off, enable the required network connection.)
Wai ti ng whil e another tas k l ocks the neces sary res ources . A
one-time waiting case may occur when a task start is
delayed or a task run lasts much longer than usual for some
particular reason and this way prevents another task from
starting. This situation is resolved automatically when the
obstructing task comes to an end. Consider stopping a task
if it hangs for too long to enabl e the nex t task to start.
Persi stent ta s k overlapping may result from an incorrectly
scheduled plan or plans. It makes sense to edit the plan in
this case.
4 Stopping At leas t one task is
stopping.
Otherwi se, s ee 5.
No action is required.
5 Idle All the tasks are idle. No action is required.
Backup plan statuses
A backup plan can have one of the following statuses: Error; Warning; OK.
A backup plan status is derived from the results of the last run of the plans' tasks.
State How it is determined How to handle
1 Error At least one task has
fail ed.
Identify the failed tasks -> Check th e tasks l og to find out
the reason of the failure, then do one or more of the
Seitenansicht 168
1 2 ... 164 165 166 167 168 169 170 171 172 173 174 ... 368 369

Kommentare zu diesen Handbüchern

Keine Kommentare